Saturday, January 7, 2012

construction failures

I can't remember if I complained (HA) about this but....

so last summer they finished construction on our building. I got moved to a new room - to supervise a computer lab with students who take Michigan Virtual High School classes. (another story in itself) I told the principal it was a demotion - he did not agree. Regardless, it was a demotion.

I have been isolated once again, feel very much alone and not part of the team. oh joy. HATE IT. HATE IT VERY MUCH. I have never hated my job like I do now.

back to the room - when it was "finished" the only things that had changed was the room had new furniture, a large screen tv and carpet. Oh, and one new cabinet where the controls for the large tv and corresponding computer are housed.

I complained. Imagine that. I complained loud. Got myself in trouble for doing so but I did succeed in getting new cabinets - like every other room in the building - that would be installed over Winter Break.

So the cabinets were installed last week, I was in the building and checked them out. They look fantastic. One slight problem. They installed them over the jacks work for my computer, my phone and the power.

So I ran into a guy in charge and he rather blew me off. He said - oh we can make cut outs in the backs of the cabinets and put grommets in to pull the wiring up and put my phone on the counter top. Ummmmmm I make attendance calls. Sometimes there are nearly a 100 to make. NOT going to make those from the counter.

I saw the building principal the same day and mentioned it to him. Might as well talk to the wind.

So today, I went up and dropped off my plants that I brought home over break. My desk was put back in the same place it had been (good). There is no where to plug anything in (bad). I sent an email to the principal AND his secretary.

Seeing as I have about 4 things that need to be done first thing on Monday, lets see how long this takes to get fixed.

Stay tuned.

No comments:

Post a Comment